ghazi52
THINK TANK: CONSULTANT
- Mar 21, 2007
- 133,215
- 182,698
- Country of Origin
- Country of Residence
About M-15;
Burhan-Havelian
- Motorway grade
- 2x 3-lane main carriageways (under-construction)
- 2x 1-lane service carriageways (planned)
Havelian-Mansahra
- Expressway grade
- 2x 2-lane main carriageways (under-construction)
-- Upgrade potential to 3-lanes is there but costs will be astronomical
- 2x 1-lane service carriageways (proposed)
-- High chance of getting rejected due to terrain, or downgraded
Mansehra-Thakot
- Highway grade
- 1x 2-lane main carriageway (under-construction)
-- A second carriageway is proposed which may be added after completion of Thakot-Raikot Section, most probably in a staircase alignment.
Thakot-Raikot (planned)
- Highway grade
- 1x 2-lane main carriageway
-- A second carriageway is proposed which may be added after completion of Mansehra-Thakot 2nd carriageway, most probably in a staircase alignment.
Burhan-Havelian
- Motorway grade
- 2x 3-lane main carriageways (under-construction)
- 2x 1-lane service carriageways (planned)
Havelian-Mansahra
- Expressway grade
- 2x 2-lane main carriageways (under-construction)
-- Upgrade potential to 3-lanes is there but costs will be astronomical
- 2x 1-lane service carriageways (proposed)
-- High chance of getting rejected due to terrain, or downgraded
Mansehra-Thakot
- Highway grade
- 1x 2-lane main carriageway (under-construction)
-- A second carriageway is proposed which may be added after completion of Thakot-Raikot Section, most probably in a staircase alignment.
Thakot-Raikot (planned)
- Highway grade
- 1x 2-lane main carriageway
-- A second carriageway is proposed which may be added after completion of Mansehra-Thakot 2nd carriageway, most probably in a staircase alignment.