Timeline of Pakistan's Nuclear Programme
1956- Pakistan Atomic Energy Commission (PAEC) established with the establishment of the Atomic Energy Research Council (AERC)
1960- Dr. I.H. Usmani, a physicist and an ex-ICS officer, takes over as PAEC Chairman from Dr. Nazir Ahmad (1955-60)
1961- PAEC sets up an Atomic Energy Mineral Centre at Lahore
1963- Pakistan Institute of Nuclear Science & Technology (PINSTECH) is established at Nilore, near Islamabad. Construction work begins under the guidance of the American architect Edward Stone.
1965- September 6th-21st, second Indo-Pak war
1965-October, Zulfiqar Ali Bhutto visits Vienna and meets Mr. Munir Ahmad Khan. They discuss India’s nuclear plans and Pakistan’s future nuclear roadmap. Their private meetings continue till 1972.
1965-December 11, Munir Khan meets President Ayub Khan at the Rochester Hotel, London. Ayub remains unconvinced that Pakistan needs to take notice of India’s nuclear program and acquire nuclear facilities while they were still easily available. Munir comes out of the meeting and tells Zulfiqar Ali Bhutto, “The President did not agree.” Bhutto replies, “Don’t worry, our turn will come.”
1965- December 21st, the 5 MW Pakistan Research Reactor-1 (PARR), supplied by the United States, becomes critical.
1965- September; Construction of 137 MW Karachi Nuclear Power Plant (KANUPP) 137 MW begins near coast of Karachi under a contract from Canadian General Electric Company (CGE)
1967- The Electronics Division is established at PINSTECH
1967- Nuclear Physics Division (NPD) is established at PINSTECH
1967- Reactor School is established in PINSTECH to train scientists and engineers, and put R&D on fast track
1968- Nuclear Non Proliferation Treaty is completed. Pakistan refuses to sign.
1970-Reactor School becomes operational
1971- July; Construction of KANUPP is completed
1971- August 1st, KANUPP reactor becomes critical
1971- October 21st, generation of electricity is achieved at KANUPP
1971- December, third Pak-Bharat war. Bharat invades East Pakistan subsequently making into Bangladesh.
1971-December President Zulfiqar Ali Bhutto takes over as President of Pakistan soon after the fall of East Pakistan. He immediately asks Mr. Munir Ahmad Khan, a nuclear engineer working as Head of Reactor Engineering at the IAEA, to return to the country and prepare a feasibility status report on Pakistan’s nuclear infrastructure. Munir Khan takes a round of all PAEC establishments and prepares a status-report which is submitted to ZA Bhutto before the Multan Conference.
1972- January 2nd, President Z.A.Bhutto calls a meeting of senior scientists and engineers at Multan where he announces the intention of building an atomic bomb for Pakistan. This meeting was attended by the future Nobel Laureate, Dr. Abdus Salam, PAEC Chairman (1960-72) Dr. I.H.Usmani and other senior scientists. It was here that Bhutto announced that he was appointing Mr. Munir Ahmad Khan, a nuclear engineer working as Head of Reactor Engineering Division at the IAEA as PAEC Chairman (1972-91) and head of the nuclear weapons program. This was the day when Pakistan embarked on its quest for the atomic bomb.
1972- PAEC was transferred from the Science and Technology Research Division to the President's Secretariat
1972- March, Mr. Munir Ahmad Khan formally takes over as Chairman PAEC
1972-May, PAEC submits a detailed nuclear plan to President Bhutto which calls for the establishment of a various nuclear plants and facilities. This plan is aimed at acquiring complete control of the nuclear fuel cycle
1972- November 28, Pakistan’s first nuclear power plant, KANUPP, inaugurated by the President of Pakistan, Z.A.Bhutto, Dr. Abdus Salam and PAEC Chairman Mr. Munir Ahmad Khan.
December 1972- Two theoretical physicists working at the International Centre for Theoretical Physics, Trieste, Italy, asked to report to the PAEC chairman by Dr. Abdus Salam. This marked the beginning of the “Theoretical Physics Group” in PAEC that would develop the designs of Pakistan’s nuclear weapons.
1972- Radio Isotopes and Applications Division (RIAD) established at PINSTECH
1973-Dr. Riazuddin travels to the United States and obtains all the declassified information on the Manhattan Project. On his return to Pakistan, he is appointed Member (Technical), by chairman PAEC.
1973- Nuclear Materials Division (NMD) established at PINSTECH, which played a critical role in Pakistan's nuclear program.
1972-PAEC decides not to pursue plans to acquire and build a pilot-reprocessing plant which is downgraded and is on offer from the UK Atomic Energy Authority. It is also decided to open negotiations with the French and the Belgians for an upgraded reprocessing facility.
1973- March, PAEC and Saint Gobain Nucleaire (SGN) of France, sign an initial contract, to prepare the basic design for a large-scale reprocessing plant at Chashma, one with a capacity of 100 tons of fuel per year.
1973-March, A team of three PAEC scientists and engineers is sent to the headquarters of the Belgian firm Belgonucliare at Mol for participation in the designing of a pilot reprocessing facility and obtain training in reprocessing of spent nuclear fuel.
1973-December, PAEC chairman announces the discovery of large-scale uranium deposits in Dera Ghazi Khan. He also announces plans for setting up 15-24 nuclear reactors by the end of the century to meet two-thirds of Pakistan’s energy requirements. This plan could not be implemented due to international sanctions and apathy of successive Pakistani governments.
1973- The Theoretical Physics Group in PAEC decides to opt for an “implosion” design for the atomic bomb in place of the gun-type bomb. Dr. Zaman Sheikh is also tasked with the development of the explosive lenses of the nuclear device.
1956- Pakistan Atomic Energy Commission (PAEC) established with the establishment of the Atomic Energy Research Council (AERC)
1960- Dr. I.H. Usmani, a physicist and an ex-ICS officer, takes over as PAEC Chairman from Dr. Nazir Ahmad (1955-60)
1961- PAEC sets up an Atomic Energy Mineral Centre at Lahore
1963- Pakistan Institute of Nuclear Science & Technology (PINSTECH) is established at Nilore, near Islamabad. Construction work begins under the guidance of the American architect Edward Stone.
1965- September 6th-21st, second Indo-Pak war
1965-October, Zulfiqar Ali Bhutto visits Vienna and meets Mr. Munir Ahmad Khan. They discuss India’s nuclear plans and Pakistan’s future nuclear roadmap. Their private meetings continue till 1972.
1965-December 11, Munir Khan meets President Ayub Khan at the Rochester Hotel, London. Ayub remains unconvinced that Pakistan needs to take notice of India’s nuclear program and acquire nuclear facilities while they were still easily available. Munir comes out of the meeting and tells Zulfiqar Ali Bhutto, “The President did not agree.” Bhutto replies, “Don’t worry, our turn will come.”
1965- December 21st, the 5 MW Pakistan Research Reactor-1 (PARR), supplied by the United States, becomes critical.
1965- September; Construction of 137 MW Karachi Nuclear Power Plant (KANUPP) 137 MW begins near coast of Karachi under a contract from Canadian General Electric Company (CGE)
1967- The Electronics Division is established at PINSTECH
1967- Nuclear Physics Division (NPD) is established at PINSTECH
1967- Reactor School is established in PINSTECH to train scientists and engineers, and put R&D on fast track
1968- Nuclear Non Proliferation Treaty is completed. Pakistan refuses to sign.
1970-Reactor School becomes operational
1971- July; Construction of KANUPP is completed
1971- August 1st, KANUPP reactor becomes critical
1971- October 21st, generation of electricity is achieved at KANUPP
1971- December, third Pak-Bharat war. Bharat invades East Pakistan subsequently making into Bangladesh.
1971-December President Zulfiqar Ali Bhutto takes over as President of Pakistan soon after the fall of East Pakistan. He immediately asks Mr. Munir Ahmad Khan, a nuclear engineer working as Head of Reactor Engineering at the IAEA, to return to the country and prepare a feasibility status report on Pakistan’s nuclear infrastructure. Munir Khan takes a round of all PAEC establishments and prepares a status-report which is submitted to ZA Bhutto before the Multan Conference.
1972- January 2nd, President Z.A.Bhutto calls a meeting of senior scientists and engineers at Multan where he announces the intention of building an atomic bomb for Pakistan. This meeting was attended by the future Nobel Laureate, Dr. Abdus Salam, PAEC Chairman (1960-72) Dr. I.H.Usmani and other senior scientists. It was here that Bhutto announced that he was appointing Mr. Munir Ahmad Khan, a nuclear engineer working as Head of Reactor Engineering Division at the IAEA as PAEC Chairman (1972-91) and head of the nuclear weapons program. This was the day when Pakistan embarked on its quest for the atomic bomb.
1972- PAEC was transferred from the Science and Technology Research Division to the President's Secretariat
1972- March, Mr. Munir Ahmad Khan formally takes over as Chairman PAEC
1972-May, PAEC submits a detailed nuclear plan to President Bhutto which calls for the establishment of a various nuclear plants and facilities. This plan is aimed at acquiring complete control of the nuclear fuel cycle
1972- November 28, Pakistan’s first nuclear power plant, KANUPP, inaugurated by the President of Pakistan, Z.A.Bhutto, Dr. Abdus Salam and PAEC Chairman Mr. Munir Ahmad Khan.
December 1972- Two theoretical physicists working at the International Centre for Theoretical Physics, Trieste, Italy, asked to report to the PAEC chairman by Dr. Abdus Salam. This marked the beginning of the “Theoretical Physics Group” in PAEC that would develop the designs of Pakistan’s nuclear weapons.
1972- Radio Isotopes and Applications Division (RIAD) established at PINSTECH
1973-Dr. Riazuddin travels to the United States and obtains all the declassified information on the Manhattan Project. On his return to Pakistan, he is appointed Member (Technical), by chairman PAEC.
1973- Nuclear Materials Division (NMD) established at PINSTECH, which played a critical role in Pakistan's nuclear program.
1972-PAEC decides not to pursue plans to acquire and build a pilot-reprocessing plant which is downgraded and is on offer from the UK Atomic Energy Authority. It is also decided to open negotiations with the French and the Belgians for an upgraded reprocessing facility.
1973- March, PAEC and Saint Gobain Nucleaire (SGN) of France, sign an initial contract, to prepare the basic design for a large-scale reprocessing plant at Chashma, one with a capacity of 100 tons of fuel per year.
1973-March, A team of three PAEC scientists and engineers is sent to the headquarters of the Belgian firm Belgonucliare at Mol for participation in the designing of a pilot reprocessing facility and obtain training in reprocessing of spent nuclear fuel.
1973-December, PAEC chairman announces the discovery of large-scale uranium deposits in Dera Ghazi Khan. He also announces plans for setting up 15-24 nuclear reactors by the end of the century to meet two-thirds of Pakistan’s energy requirements. This plan could not be implemented due to international sanctions and apathy of successive Pakistani governments.
1973- The Theoretical Physics Group in PAEC decides to opt for an “implosion” design for the atomic bomb in place of the gun-type bomb. Dr. Zaman Sheikh is also tasked with the development of the explosive lenses of the nuclear device.