The Indians have received the R-37M's and R-77M's on their planes now which in their minds will balance the terms of a future engagement, and Sindoor is still technically in effect and there maybe is a window of opportunity given that PAF is distracted with deployments in Saudi and the Armed forces distracted by the Yemen issue, etc.

Both India and Israel (and also Iran btw !! ) all have vested interests to both challenge and destroy the Makkah Pact at birth right now, so you could well see an operation in the very near future to stress test the pact by Israel and India.
 
Last edited:
India is plagued with these over ambitious projects that delivery zero value long-term. Its surprising how many projects they have penned and how many end up in the trash heap.

At some point, they will start getting things right so I don't think Pakistan should be that dismissive. If they do the Super 30MKI project all in house(with the exception of the engines ) then that could be the start of something significant for them as they can carry alot of intellectual property over from the Tejas programme over, etc and feed into the AMCA.
 
Last edited:
At some point, they will start getting things right so I don't think Pakistan should be that dismissive. If they do the Super 30MKI project all in house(with the exception of the engines ) then that could be the start of something significant for them as they can carry alot of intellectual property over from the Tejas programme over, etc and feed into the AMCA.

Agree, the problem they have is how long everything takes. The system is built to an extent it simply does not take into account fast paced changes in tech.

After 20 years of evaluation they ordered 36 (now 32!) Rafales. It has been 5 years and no follow on contract signed.

It took them 25 years to evaluate then induct the Hawk trainer.

HAL were still producing Jaguars in 2003 and MIG-21S as late as 1985.

Tejas first flew in 2001.

Arjun took 25 years to develop and they only have 124 in service to this day.

HAL has estimated 10 years to develop and deliver the SU-30 upgrade. As its HAL we can safely add another 5 years on top of that estimate.

So even if the upgrade is signed tomorrow you are looking at early 2040s for them to start delivering SU-30s with ugrades.
 