Bhojpuranchali
SpeedLimited
The combat range of Tejas MK1A is 739 kilometres its much higher than the 550 kilometres combat range of F16Sir Ji Forget what the so called Article by that "Ritu Sharma" Says
ADSA-HAL or be it MOD & PMO and even IAF had made it pretty clear from day 1 LCA was never meant to be an export oriented platform like what chinese wanted from JF17
ADA-HAL desigend LCA as a Light fighter for Patrol and excort roles that too Indiside Indian territory to replace 1960s era Mig21s but deu to constant goal post changes and new requirement added every time ADA-HAL met the last ones LCA Morphed into worlds smallest supersonic MRCA in its catogory thats supersonick at all alltitudes and still carry 5250 Kgs externally and now has a AESA radar and new gen onboard self protection suite and latest HOBS capability and entire LCA programme till its first 40 MK1 copies were made along with all those 4500 hours of testing and making of diffrent labs /fuel and avionics and weapon systems costed little over 2.3 Billion US dollars since its first flight tell me another fighter programme that achieved all this under this costs
while JF17 was baught /develpd by china-pakistan as nothing else was on offer to pakistanby west or russia nor could it afford anything else axept chinese who sold them JF17 which they themselfs did not use as it was not usefull in there doctroine deu to its .. khair janne do sannu ki
as for record JF17 was always a chines made fighter and chines had all the IP rights but since JF17 had a Russian RD93 engine could not market it to those markets where potentially Mig29 was oferred under its agreement with Russians they chose a clever JOINT DEVELOPMENT strategy and sold PAC Kamra assembelled fighters as jointy develpoed fighters![]()
![]()
- The F-16 Fighting Falcon's combat radius is 550 km (340 mi) on a hi-lo-hi mission with six 450 kg (1,000 lb) bombs.
Radius of action - Wikipedia
Tejas Mk 2 languishes amid lack of funds
India's Light Combat Aircraft (LCA) Tejas Mk 2 programme is languishing without funding, months after the project was approved by New Delhi.
Last edited:



