The argument was always the need. When we have 3 brand new plants not operating to their full potential resulting in excess capacity over demand.
If you can't understand that, it's your failure.
You have debunked absolutely nothing.
That is a separate point.
Adani is supplying power much cheaper than BD oil based plants and if those coal fired power stations come back online, BD can stop using more of those really expensive oil based power stations. They simply need to be decommissioned asap.
Originally Roopur first reactor was supposed to come online in 2023 and the second this year, but now it looks like no power will be supplied till end of 2025. Adani has met the delay here nicely.
Without this Adani power station over last 18 months, BD would have been in all kinds of trouble with electricity supply.
Maybe over the medium to long term it will be redundant but to plan for it all those years ago was not the worst idea.