Indos
INT'L MOD
- Thread starter
- #136
Patimban Port Officially Launches International Container Shipping Services
Kamis, 16 Jul 2026
JAKARTA – The arrival of the Mediterranean Shipping Company (MSC) Aria III, a container vessel measuring more than 200 meters in length, at the container terminal of Patimban Port in Subang, West Java, marks the beginning of a new phase in the development of Indonesia's logistics ecosystem, further integrating the country into global trade networks.
The vessel, which arrived from Singapore before continuing its voyage to Laem Chabang (Thailand) and the major Chinese ports of Shekou, Ningbo, and Shanghai, represents the launch of Patimban Port's first international container shipping service.
According to the United Nations Conference on Trade and Development (UNCTAD), approximately 80% of global trade by volume is transported by sea, making port efficiency a key determinant of a country's international competitiveness. This underscores the strategic importance of Patimban Port to Indonesia's national logistics sector.
Against this backdrop, Yukki Nugrahawan Hanafi, Senior Vice President of the International Federation of Freight Forwarders Associations (FIATA) and Commissioner of PT Pelabuhan Patimban Internasional (PPI), said the introduction of MSC's regular container service represents more than the addition of a new shipping route—it marks the emergence of a new international logistics ecosystem that will strengthen Indonesia's competitiveness in global trade.
He added that the successful launch of MSC's service is expected to encourage additional international shipping lines to operate from Patimban, expanding connections to Asia, the Middle East, Europe, and the Americas."As the world's largest archipelagic nation, Indonesia needs more than just large ports. We need an integrated port network capable of handling international trade efficiently while strengthening the resilience of our national supply chain amid geopolitical uncertainty and global disruptions," Yukki said.
Patimban's container terminal currently occupies 10 hectares with an annual handling capacity of 250,000 twenty-foot equivalent units (TEUs). Terminal operator PT Patimban Global Gateway Terminal (PGT) plans to expand capacity to 1.65 million TEUs per year.
In the long term, Patimban is designed to handle 7.5 million TEUs annually at its container terminal and 600,000 vehicles per year at its automotive terminal, making it one of Indonesia's largest integrated port developments.
Capacity expansion is being implemented in phases. The container terminal began operations in January 2026 with one Mobile Harbour Crane (MHC), followed by the addition of two more MHCs in April 2026.
Further equipment deployment is scheduled throughout 2026. By September, the terminal is expected to receive nine Rubber-Tyred Gantry (RTG) cranes, three Ship-to-Shore (STS) cranes, four reach stackers, and 16 terminal trucks. By December, three STS cranes and nine Electric Rubber-Tyred Gantry (E-RTG) cranes are expected to be fully installed and operational.
According to Yukki, once all planned equipment is commissioned, the terminal's annual capacity is projected to increase to approximately 800,000 TEUs.
"The investment in new equipment will not only increase terminal capacity but also improve cargo handling productivity, reduce vessel turnaround time, and enhance schedule reliability for shipping services," he said.
In addition to its container terminal, Patimban has operated an automotive terminal since 2022 on a 22.4-hectare site with an annual capacity of 218,000 completely built-up (CBU) vehicles for both export and import activities.
Improving land connectivity remains a key priority in establishing Patimban as a world-class port. A 37-kilometer toll road linking the Cikopo–Palimanan Toll Road to Patimban is being constructed in phases through the end of 2026, with additional sections expected to become operational in 2027.
Once completed, the toll road is expected to reduce travel time from the East Karawang industrial area and the northern coastal region of West Java from approximately 1.5–2 hours to just 30–40 minutes.
Pelabuhan Patimban Resmi Layani Pengiriman Peti Kemas Internasional
Saat ini terminal Peti Kemas Patimban memiliki seluas 10 hektar dan mampu melayani 250.000 TEUs per tahun.










