Yasser76
Elite Member
I wish we had made the jump to producing the Mirage 3NG (fly-by-wire upgrade of the Mirage 3/5) locally. It would've given us a very good multirole fighter platform (Cheetah-level) to operate in the 1990s and 2000s until the JF-17 emerged. In fact, it would've given us the space to develop the JF-17 to B3+ standards from the start.
The fantasy fleet isn't even that good.
It should've been 4 A330 MRTTs, 12 Erieye-ERs mounted to E195/E2 plus 28 C390s, duh.
Was trying to balance an imaginary budget!

