Pakistan Ship Building - KS&EW

Keel Laying Ceremony of MILGEM Class Corvette for Pakistan Navy was held at Karachi Shipyard & Engineering Works (KS&EW). Chief of the Naval Staff Admiral Muhammad Amjad Khan Niazi graced the occasion as Chief Guest.

While addressing the ceremony, the honourable Chief Guest expressed that it is a matter of pride to witness the Keel laying of MILGEM Corvette in Karachi Shipyard being constructed in collaboration with M/s ASFAT of Turkey.

The Admiral highlighted that it is a historic occasion as Ministry of Defence Production, Pakistan Navy, Karachi Shipyard and M/s ASFAT of Turkey have joined hands for construction of two Corvettes in Pakistan while another two are under construction at Turkey. Naval Chief appreciated the performance of KS&EW and mentioned that indigenization is at the forefront of our policy and it is convincing to see state of the art warship being built in Pakistan.

Construction of corvettes in Pakistan is aimed to provide impetus to local ship building industry and to further enhance KS&EW capabilities. These ships are being constructed as per modern naval ship class standards and will be equipped with state of the art weapons & sensors including surface to surface, surface to air missiles and anti-submarine weapons.

The addition of these ships would significantly add to lethality and operational capability of Pakistan Navy.

Earlier, the MD KS&EW Rear Admiral Ather Saleem presented performance of KS&EW and highlighted that the shipyard is fully cognizant and aligned with the goals set forth by Government and Pakistan Navy for self-reliance in Defence Shipbuilding Industry.

He emphasized that deep rooted friendship with brotherly country Turkey for this mega project will open new vistas of further cooperation in the field of indigenous warship construction and other defence sectors in Pakistan. MD KS&EW also highlighted current production activities of KS&EW that include constructions for both inland and abroad projects.

August , 2021 PDF
 
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.
 
1648758914441.png



,.
 
Babur Class Corvette

Warship No. 3 of the Babur class of guided missile heavy corvettes, PNS BADR, under construction at Karachi Shipyard & Engineering Works...

1650887138564.png
 
1651335060567.png



Karachi Ship Yard,

First Ship built in Karachi in 1960. Al Abbas....
This was build for Mohammadi Steam ship corporation and was inaugurated by Field Marshall Mohammad Ayub Khan.
 
Launching Ceremony of MILGEM Class Corvette PNS BADR held at Karachi Shipyard & Engineering Works (KS&EW). Prime Minister of Islamic Republic of Pakistan Mian Muhammad Shehbaz Sharif graced the occasion as Chief Guest.

The newly launched corvette is equipped with state of the art weapons & sensors including surface to surface, surface to air missiles and anti-submarine weapons, which would significantly boost Pakistan Navy’s defensive and offensive capabilities. Contract for construction of four MILGEM Corvettes for PN was signed between DGMP and M/s ASFAT in 2018; wherein, two ships will be constructed at Istanbul Naval Shipyard (INSY), Turkey and other two ships at KS&EW, Pakistan. In this regard, 1st Ship of the Project, PNS BABUR was launched at Turkey in August 2021.

May, 2022..

1653053271380.png
 
A nice picture of 281..

1654278336689.png
 
Pakistan Navy has signed a contract with KS&EW (Karachi Shipyard & Engineering Works) for the production and procurement of an unspecific number of indigenously designed and locally built Gun Boats.

The most prominent weapon system on the Gun Boat is the Turkish made Aselsan 25 mm STOP Remote Controlled Stabilized Naval Gun System.

The same Gun System has been used on Pakistan Navy's Azmat Class FACs and Yarmook Class OPVs.

1665087982187.png





1665087966595.png
 
October 2022
The inauguration ceremony of the 48-ton bollard pulltug by Pak Navy was held at Karachi Shipyard and Engineering Works whose special guest was Deputy Chief of Naval Staff Vice Admiral Imran Ahmed.

This "tug" is a reflection of Karachi Shipyard's high performance built in collaboration with TOR Group Turkey. He praised the engineers of the shipyard and said that this organization will continue to strive for the development of Pakistan Navy in the future as well. On this occasion, he also thanked the Ministry of Defense, which had provided full support in the completion of this project.

It should be noted that this tug established by Pakistan Navy is equipped with high technical model as well as various facilities including seamanship, navigation and security arrangements.


1666958251186.png




1666958306884.png
 
Pakistan's KSEW displays a model of upcoming Jinnah Class Frigates to be built indigenously for Pak Navy.

Ships will have 16 VLS cells for air def missiles and 8 anti-ship cruise missiles.
Length - 119m
Breadth - 15m
Displacement - 3300tons
Speed - 48km/h


1668546369316.png
 
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.
 
PNS BADR ( F - 281 ) at KS & EW, Karachi.... December, 2022

1671114100955.png
 
.,
1671114742579.png
 
Pakistan’s Bahria Boat Building Yard has launched its first 12T marine assault boat.
Karachi Naval Dockyard is also producing these boats in parallel.
In total, 18 boats in two different propulsion configuration are on order with several already operational.

1671140396323.png
 
Various projects.....
Repair activities....

1674923769084.jpeg



1674923741687.jpeg



SR3.jpg



1674923829778.jpeg
 

Users who are viewing this thread

Latest Posts

Back
Top