Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
We have to wait until 2027-2028 for Murad aesawaiting for MURAD and AA missiles integration
no, it is flying for almost 1 year and they are trying tu tune up nothing else. Serial production of MURAD is ongoing because there would not be physical change on the radar.We have to wait until 2027-2028 for Murad aesa
Do you know better than Aselsan general manager Ahmet Akyol?no, it is flying for almost 1 year and they are trying tu tune up nothing else. Serial production of MURAD is ongoing because there would not be physical change on the radar.
1 F16 and 1 Akinci are flying with MURAD ,is it difficult to add HURJET to the list?Do you know better than Aselsan general manager Ahmet Akyol?![]()
Tests are still ongoing. It hasnt entered the inventory.1 F16 and 1 Akinci are flying with MURAD ,is it difficult to add HURJET to the list?
i didnt say anything about inventory but serial production is ongoingTests are still ongoing. It hasnt entered the inventory.
Are you talking about testing it on a Hurjet?
Idk. Source?i didnt say anything about inventory but serial production is ongoing
Hurjet 2 got painted fighter colors.
We use essential cookies to make this site work, and optional cookies to enhance your experience.