hodor
Registered Member
For this project to enter into service in Pakistan and be produced there, the development of a Turkish engine is absolutely necessary. It is not possible for Kaan jets equipped with the F110 engine to be delivered to Pakistan.
The testing of the Turkish engine will take a long time. While we developed the TS1400 engine in a short period, its testing is still ongoing. They are projecting 2027 for mass production. If it took this long for a helicopter engine, I can estimate that Kaan’s engine might be ready around 2035. If Pakistan secures itself and waits for Kaan until then, it will undoubtedly become part of the Pakistan Air Force inventory.
The testing of the Turkish engine will take a long time. While we developed the TS1400 engine in a short period, its testing is still ongoing. They are projecting 2027 for mass production. If it took this long for a helicopter engine, I can estimate that Kaan’s engine might be ready around 2035. If Pakistan secures itself and waits for Kaan until then, it will undoubtedly become part of the Pakistan Air Force inventory.







