Building highspeed rail by
lego principle: pre-manufacturing rail section and putting them together
6h are needed to make each giant steel concrete beam
Length 32.6 m
Wide 12.6 m
Weight 750 tons
Work carried out by Vietnamese construction company Coteccon

 

Yes, I remember what he posted; Viettel's calculation for the INS drift rate of a 1800 km ballistic missile.
Based on the latest unofficial leak, after being stuck for 5-6 years at the 600 km range, Viettel has been able to break the technical barrier by resolving the mathematical calculations for the inertial navigation system drift error algorithm and extend the VCM-06 LACM to way over 1000 km now. This is a major breakthrough as it will also allow Vietnam to extend the range of our ballistic missiles, and long-range suicide drones
 
Being black in Vietnam | the untold difference
Just respect the rules, follow the laws
The Vietnamese in general don’t care if you are black or white.

 
Vietnam congrats China to national day in the video clip she shares.
 
Mi-24 flying tank
today museum pieces
1791096218918.png

 
“Little Moscov”
Probably soon more Russians than locals
as the war continues without end in sight Russian tourists queuing to withdraw money from banks in the city of Nha Trang. Many stay months or even years.

 
Precast girders that later carry the steel rail tracks,
each 32m in length, 750 tons in weight, being transported to the construction site
At least 4,500 girders are needed for the first section of 350 kmh double-track highspeed rail
to speed up the HSR construction, multiple teams are working simultaneously.
Target commercial operations in 2029