AJK has an installed hydropower capacity of about 2,500–2,600 MW connected to Pakistan’s national grid
Key major projects include:
Mangla Dam (≈1,310 MW after upgrades)
Neelum–Jhelum (969 MW)
Other smaller hydropower plants (Jagran, Gulpur, Patrind, etc.)
Overall, AJK produces well over 2,000 MW at peak availability, making it a net electricity exporter region.
Generated in AJK: ~2,000–2,600 MW (hydro capacity)
Used in AJK: ~350–600 MW
Sent to Pakistan: majority of the rest (~1,500–2,000+ MW equivalent contribution)