Quwa
Research Partner
These are real. We'll see a jet-powered version of one of these (similar to Shahed-236 and Geran-3/4) too. Pakistan is a full believer in OWAs, SSMs/ASBMs, low-cost CMs, and USVs and AUVs.Mere drawings nothing more
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
These are real. We'll see a jet-powered version of one of these (similar to Shahed-236 and Geran-3/4) too. Pakistan is a full believer in OWAs, SSMs/ASBMs, low-cost CMs, and USVs and AUVs.Mere drawings nothing more
For some time now, they just keep pumping out different designs and nothing goes into production.These are real. We'll see a jet-powered version of one of these (similar to Shahed-236 and Geran-3/4) too. Pakistan is a full believer in OWAs, SSMs/ASBMs, low-cost CMs, and USVs and AUVs.
Real test will be mass production facilities and ongoing manufacturing and not stopping at one or two hundred unitsThese are real. We'll see a jet-powered version of one of these (similar to Shahed-236 and Geran-3/4) too. Pakistan is a full believer in OWAs, SSMs/ASBMs, low-cost CMs, and USVs and AUVs.
Pakistan’s Heavy Industries Taxila (HIT) unveiled two major long-range loitering munitions, the **D-248** and **S-369**, at the 2026 Indus Robotics and Autonomous Systems (RAS) Expo, marking the country's largest and furthest-reaching kamikaze drones to date.
**D-248**
• Design: Tailless delta-wing
• Range: 2,200 – 3,000 km
• Payload: 30 – 50 kg (MTOW: 240 kg)
• Wingspan: 3.3 m
• Speed: 185 km/h cruise | 225 km/h max
• Endurance &
Ceiling: 12 – 14 hours | up to 4,500 m altitude
**S-369**
• Design: Arrow-delta wing
• Range: 1,500 – 2,000 km
• Payload: 30 – 50 kg (MTOW: 215 – 225 kg)
• Wingspan: 4.0 m
• Speed: 160 – 180 km/h cruise | 220 km/h max
• Ceiling: up to 4,500 m altitude
Both systems significantly expand long-range precision strike capabilities, combining heavy warhead capacities with high-altitude, long-endurance flight.
View attachment 209777

Im just saying, back in 2009 when Pakistan was first denied predator drones, i suggested on the original PDF, that Pakistan look into making something like these kamikaze drones. Suggesting that Pakistan could put Bakhtar Shikan on a radio controlled airframe with tv and GPS Guidance where it could then use its rocket powered engine to engage targets. Imagine my consternation that within 10 years they started hitting the battlefield for real.These are real. We'll see a jet-powered version of one of these (similar to Shahed-236 and Geran-3/4) too. Pakistan is a full believer in OWAs, SSMs/ASBMs, low-cost CMs, and USVs and AUVs.
We don't really know what has or hasnt gone into production. We thought the same of Fatah I but it seems there were a good number to fire at india in 5/2025.For some time now, they just keep pumping out different designs and nothing goes into production.
But okay let's see.
No more than 36 F1s were fired that's the extreme number I am giving you, good number of F1 like rockets mean over a 100-200 should have been fired. It's not that we did not want to fire that many, we did wanted to but the total numbers were limited I would say we didn't even had more than 200 in service in May 2025. Things were even more desperate for F2, where not a single F2 was fired.We don't really know what has or hasnt gone into production. We thought the same of Fatah I but it seems there were a good number to fire at india in 5/2025.
I believe PA fired F1s against Iran also again in numbers below 10.No more than 36 F1s were fired that's the extreme number I am giving you, good number of F1 like rockets mean over a 100-200 should have been fired. It's not that we did not want to fire that many, we did wanted to but the total numbers were limited I would say we didn't even had more than 200 in service in May 2025. Things were even more desperate for F2, where not a single F2 was fired.
production ramped up after may 2025. Things are starting for us just now, some people need to be sacked for their negligence pre 2025
They working in the right direction, 1000km rang is ticked we need mass production of longer range Drones and missiles.I believe PA fired F1s against Iran also again in numbers below 10.
But yes, Production remains a serious bottleneck for Pakistani defence industry.
We use essential cookies to make this site work, and optional cookies to enhance your experience.