The tunnel on chenab can be build in 4-5 years. It can reduce water going to Pakistan by up to 1 MAF.
A Chenab diversion is not a 4–5 year project..... Even routine hydropower tunnels take years, a basin scale diversion across the Himalayas is a 15 to 20 years undertaking at minimum, and that too at exceptionally high costs..
And 1 MAF isn't something you "trim" with a tunnel... it would require massive, multi reservoir infrastructure that simply doesn't exist and won't appear overnight..
The real issue today is far more mundane and far more immediate... upstream control over flow timing through existing hydropower projects... That capability already exists and is the only lever that can realistically be expanded in the near term...