PAF J-35AE - News, Updates and Discussions

Meanwhile
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.
 
Cross-post from the PLA-thread:

If I'm not mistaken, then this is one of the clearest image of the J-35A!
Hopefully more soon ...
😀


(Image via @恒苏Actline from Weibo)

J-35A - best so far - 恒苏Actline.jpg
 
You know, I have to go through translation software for everything I do in PDF. It's a huge hassle and it takes me at least 10 minutes to seriously reply to a post ..........你知道,我在 PDF 中所做的一切都必须通过翻译软件。真是太麻烦了,我至少要花10分钟才能认真回复一个帖子…………

Is it possible to merge this thread directly with the main J35 thread?是否可以将此线程直接与主 J35 线程合并?
These two threads have too much similar and duplicate content.这两个线程有太多相似和重复的内容。

Bro, have a try.

哥们 翻译网页 安利这个给你 你试试是不是好用 https://hcfy.ai/docs/installv2/
划词翻译 Chrome Web Store


1730668986411.png
 
@Maarkhoor If the name change is confirmed, perhaps the title of this thread should be changed to:

J-35AE to be inducted soon| Pilot training reportedly in progress​

J-35 (WS21) is the code for the export version.J-35A (WS19) is the code for the PLAAF version. There is no J-35AE.PAF may get J-35(WS21) in short term.It has no possibility to get J-35A(WS19) in short term.

1. Although the WS19 has been finalized and started small batch production, it is not yet fully mature. the WS19 is a completely new engine design, which needs a lot of flight tests and detail adjustments. At the same time, the matching maintenance system also needs to be re-established.WS21 is an upgraded engine, its development risk is very small, the original maintenance system can be easily transitioned to WS21.
2. WS21 can be easily introduced into the JF-17 system and become the common engine for JF-17 and J-35. This combination of 4th+5th fighters using the same engine will greatly reduce the use and maintenance costs of the PAF. It is also the best combination for these two export-oriented fighters. Of course, the WS21 could also be sought to be produced in Pakistan after the conditions are in place in Pakistan.

Bro, have a try.

哥们 翻译网页 安利这个给你 你试试是不是好用 https://hcfy.ai/docs/installv2/
划词翻译 Chrome Web Store
Thanks, bro.
I'm using the translation feature that comes with Microsoft Edge to translate the page, and DeepL to translate what I'm saying. The Google family of products doesn't work.

I have tested many translation programs including OpenAI and they do not work to my satisfaction. The biggest problem with foreign translation software is the inability to recognize words unique to the Chinese context. Chinese translation software can recognize these unique words very well, but they will just block certain sensitive content. For a large number of terms specialized for Chinese military fans, all translation software can do nothing. Especially for Chinese civilian political terms, all translation software has a large number of mistranslations.

So, I'll focus on the weapons aspect of my future statements in PDF, and stay away from other topics.
 
J-35 (WS21) is the code for the export version.J-35A (WS19) is the code for the PLAAF version. There is no J-35AE.PAF may get J-35(WS21) in short term.It has no possibility to get J-35A(WS19) in short term.

1. Although the WS19 has been finalized and started small batch production, it is not yet fully mature. the WS19 is a completely new engine design, which needs a lot of flight tests and detail adjustments. At the same time, the matching maintenance system also needs to be re-established.WS21 is an upgraded engine, its development risk is very small, the original maintenance system can be easily transitioned to WS21.
2. WS21 can be easily introduced into the JF-17 system and become the common engine for JF-17 and J-35. This combination of 4th+5th fighters using the same engine will greatly reduce the use and maintenance costs of the PAF. It is also the best combination for these two export-oriented fighters. Of course, the WS21 could also be sought to be produced in Pakistan after the conditions are in place in Pakistan.


Thanks, bro.
I'm using the translation feature that comes with Microsoft Edge to translate the page, and DeepL to translate what I'm saying. The Google family of products doesn't work.

I have tested many translation programs including OpenAI and they do not work to my satisfaction. The biggest problem with foreign translation software is the inability to recognize words unique to the Chinese context. Chinese translation software can recognize these unique words very well, but they will just block certain sensitive content. For a large number of terms specialized for Chinese military fans, all translation software can do nothing. Especially for Chinese civilian political terms, all translation software has a large number of mistranslations.

So, I'll focus on the weapons aspect of my future statements in PDF, and stay away from other topics.
Don't worry INSHALLAH we would get it
 
Interesting!

To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.


i guess i am right the third time…. i said J31/J35 will be flying with PAF by dec 2026 … just like i confirmed J10C news 2 years before its induction and confirmed Su35 cancellation news as well….

so far all predictions stand true… where are the folks who have been mocking me since jan 2024 ???? 😘
 
If Pakistan is getting J35 in 2026, wonder what is India's answer and counter.
 

Users who are viewing this thread

Latest Posts

Back
Top