Pakistan Major Dams News and Discussions

1782505697243.png

Karot Hydropower Project (720 MW) was commissioned on 29 June 2022, becoming the first major hydropower project completed under the China-Pakistan Economic Corridor (CPEC) and the first large-scale hydropower investment under China's Belt and Road Initiative (BRI).

Located on the Jhelum River, Karot HPP has become a cornerstone of Pakistan's clean energy transition. Since its commissioning, the project has generated a cumulative 11 billion kWh of clean electricity (as of 2026), with an average annual generation of approximately 3,206 GWh.

The project supplies enough renewable electricity to meet the annual energy needs of more than 5 million Pakistanis, while avoiding approximately 12 million tonnes of cumulative CO₂ emissions—equivalent to around 3.5 million tonnes of CO₂ each year.

Developed under the Build-Own-Operate-Transfer (BOOT) model with a 30-year concession period, Karot Hydropower Project will eventually be transferred to Pakistan as a permanent national asset, leaving a lasting legacy for future generations.

💧
⚡
Commissioned: 29 June 2022
🔋
Installed Capacity: 720 MW
⚡
Cumulative Generation (2022–2026): 11 Billion kWh
🌱
Average Annual Generation: 3,206 GWh
 
There were some chatter of Punjab govt also now interested in building dams.... I honestly believe one of the easiest dams that could be built would be the Soan Dam... Most of the land is owned by housing societies that are mostly empty... Would be one of the easiest land acquisitions....
 
Because the dam will take 3 to 5 years to be made and then you wait for the rain which may or may not come in the tenure of the present government.
When it does rain,
-- it may not be enough to fill the dam
but
-- if it does fill the dam then, being in a far flung and less populated area, it wont be visible to the awam.
-- The same ungrateful and illiterate awam then may not connect rain with possible flash floods and then realise how big of a blessing the rulers have been by spending the awam money on the country and thus may not shower praise on them.

The current and previous incompetent rulers want a show piece to shove it down the throat of awam every time they go to a jalsa. Atomic explosions, motorway, and metro bus are still used in jalsa. Till last elections, the LNG based power plants and coal power plants were touted as greatest projects to rid pakistan of darkness only for them to become devastating for the agriculture, health and the energy mix.

These are the reasons very few long term projects lasting more than 5 yrs development have been made in Pakistan.


Its fcukedup man. How can such a country survive or exist for longer ? I feel bad saying this but that is the reality. Everybody with last brain cells left will tell you this country is not designed to exist for long.
 

Users who are viewing this thread

Back
Top