Ghseean
Senior Member
- Feb 28, 2012
- 2,216
- 2,517
yes both were already handed over to Pakistan by CNNC in February 2023Are both k2 and k3 are fully operational now
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
yes both were already handed over to Pakistan by CNNC in February 2023Are both k2 and k3 are fully operational now
Are both k2 and k3 are fully operational now
Reactor Type | Model | Owner | Operator |
PWR | ACP-1000 | PAKISTAN ATOMIC ENERGY COMMISSION | PAKISTAN ATOMIC ENERGY COMMISSION |
Reference Unit Power (Net Capacity) | Design Net Capacity | Gross Capacity | Thermal Capacity |
1017 MWe | 1014 MWe | 1100 MWe | 3060 MWt |
Construction Start Date | First Criticality Date | ||
31 May, 2016 | 21 Feb, 2022 | | |
First Grid Connection | Commercial Operation Date | ||
04 Mar, 2022 | 18 Apr, 2022 | | |
Electricity Supplied | Energy Availability Factor | Operation Factor | Energy Unavailability Factor | Load Factor |
6.18 TW.h | 96.6 % | 91.2 % | 3.4 % | 90.0 % |
Year | Electricity Supplied [GW.h] | Reference Unit Power [MW] | Annual Time On Line [h] | Operation Factor [%] | Energy Availability Factor [%] | Load Factor [%] | ||
---|---|---|---|---|---|---|---|---|
Annual | Cumulative | Annual | Cumulative | |||||
2022 | 6181.900 | 1017 | 6287 | 91.2 | 96.6 | 96.6 | 90.0 | 90.0 |
Reactor Type | Model | Owner | Operator |
PWR | ACP-1000 | PAKISTAN ATOMIC ENERGY COMMISSION | PAKISTAN ATOMIC ENERGY COMMISSION |
Reference Unit Power (Net Capacity) | Design Net Capacity | Gross Capacity | Thermal Capacity |
1017 MWe | 1017 MWe | 1100 MWe | 3060 MWt |
Construction Start Date | First Criticality Date | ||
20 Aug, 2015 | 28 Feb, 2021 | | |
First Grid Connection | Commercial Operation Date | ||
18 Mar, 2021 | 21 May, 2021 | | |
Electricity Supplied | Energy Availability Factor | Operation Factor | Energy Unavailability Factor | Load Factor |
12.45 TW.h | 80.8 % | 82.7 % | 19.2 % | 80.6 % |
Year | Electricity Supplied [GW.h] | Reference Unit Power [MW] | Annual Time On Line [h] | Operation Factor [%] | Energy Availability Factor [%] | Load Factor [%] | ||
---|---|---|---|---|---|---|---|---|
Annual | Cumulative | Annual | Cumulative | |||||
2021 | 6208.890 | 1014 | 5910 | 96.4 | 98.6 | 98.6 | 98.8 | 98.8 |
2022 | 6240.360 | 1017 | 6540 | 74.7 | 70.3 | 80.8 | 70.0 | 80.6 |
Reactor Type | Model | Owner | Operator |
PHWR | CANDU-137 MW | PAKISTAN ATOMIC ENERGY COMMISSION | PAKISTAN ATOMIC ENERGY COMMISSION |
Reference Unit Power (Net Capacity) | Design Net Capacity | Gross Capacity | Thermal Capacity |
90 MWe | 125 MWe | 100 MWe | 337 MWt |
Construction Start Date | First Criticality Date | ||
01 Aug, 1966 | 01 Aug, 1971 | | |
First Grid Connection | Commercial Operation Date | ||
18 Oct, 1971 | 07 Dec, 1972 | | |
Permanent Shutdown Date | |||
01 Aug, 2021 |
Name | Type | Status | Location | Reference Unit Power [MW] | Gross Electrical Capacity [MW] | First Grid Connection |
---|---|---|---|---|---|---|
CHASNUPP-1 | PWR | Operational | KUNDIAN | 300 | 325 | 2000-06-13 |
CHASNUPP-2 | PWR | Operational | KUNDIAN | 300 | 325 | 2011-03-14 |
CHASNUPP-3 | PWR | Operational | KUNDIAN | 315 | 340 | 2016-10-15 |
CHASNUPP-4 | PWR | Operational | KUNDIAN | 313 | 340 | 2017-06-25 |
KANUPP-1 | PHWR | Permanent Shutdown | Karachi | 90 | 100 | 1971-10-18 |
KANUPP-2 | PWR | Operational | Karachi | 1017 | 1100 | 2021-03-18 |
KANUPP-3 | PWR | Operational | Karachi | 1017 | 1100 | 2022-03-04 |
Our entire nuke program is China sponsored bhai. Everything!It is good to know that Pakistan and China continue to work on more nuclear plants. The more the merier.
We want these plants far away from Karachi . They pose too a great a risk.Islamabad: Pakistan has started loading fuel to its Chinese-assisted 1,100MW nuclear power plant in Karachi for testing in run-up to its commercial operations in April 2021, according to a media report on Wednesday.
The fuel loading for the newly built Karachi Nuclear Power Plant Unit-2 (K-2) began on Tuesday after obtaining fuel load permit from the Pakistan Nuclear Regulatory Authority.
The fuel loading was witnessed by Director General of the Strategic Plan Division Lt Gen Nadeem Zaki Manj, Pakistan Atomic Energy Commission (PAEC) Chairman Mohammad Naeem and senior Chinese and Pakistani officials, the Dawn newspaper reported.
K-2 is a pressurised water reactor based on the Chinese HPR-1000 technology and a third generation plant equipped with advanced safety features, according to officials.
The construction of K-2 plant started on August 31, 2015 ..
and its commercial operation will begin in April 2021 after undergoing several operational and safety tests.
K-2 is one of the two 1,100MW nuclear power plants being constructed in Karachi. The other plant, K-3, is expected to become operational by the end of 2021.
Ok hindjew, come down and eat some pudi sushi.Our entire nuke program is China sponsored bhai. Everything!
Anybody thinks otherwise I’d beat him up here in front of everyone in 2 minutes.
AQ Khan/ Samar Mubarakmand k dramay/ shoshay karatay hain laurru.
We all know da truth, that what China wants from us is da same as what China wants from da DPRK no?
Baqi sub jharrpaali convert musings.
Bukvaas bund kar…..get real…..Ok hindjew, come down and eat some pudi sushi.
What are you doing in Japan, why would go there to write bakwas about Pakistan?Bukvaas bund kar…..get real…..
What are you doing in Japan, why would go there to write bakwas about Pakistan?
I bet you sneak in cow ka cola with your lunchOh chal oaay……you tell me one thing wes making ourselves in our made in China nuke program?
Bukvaas karta hae?
Centrifuge? We coulda got those from China too no?