Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Interesting develeopment first BMC engines and transmissions delivered(FOR TEST )
ALTAY tank and FIRTINA hovitzers will use these power packs. 1500HP BATU engine for ALTAY and 1000hp UTKU engine for FIRTINA
View attachment 68154
View attachment 68155
Interesting develeopment first BMC engines and transmissions delivered(FOR TEST )
ALTAY tank and FIRTINA hovitzers will use these power packs. 1500HP BATU engine for ALTAY and 1000hp UTKU engine for FIRTINA
View attachment 68154
View attachment 68155
It won't take that long. We don't have time. I think they will complete the very necessary tests within 6 months and mass production will begin.another 1 or 2 year test, we can expect 2026 first Altay with Turkish engine delivered to the armed forces.
It won't take that long. We don't have time. I think they will complete the very necessary tests within 6 months and mass production will begin.
I think we will not use S. Korean Power Pack. I have no proof. Just a personal opinion.
I think The BATU Power Package has matured faster than expected. Add to that the exorbitant price of the S. Korean Power Package and in this economic crisis environment, no other decision could have been made.I do think same, they came with stupid prices. A single unit was if i remember correct 1 milyon dollar .
I think The BATU Power Package has matured faster than expected. Add to that the exorbitant price of the S. Korean Power Package and in this economic crisis environment, no other decision could have been made.
Of course, these are just my personal speculations. We will wait and see.
Yes. Especially S. Korean Powerpack's transmission part.Aren't they field testing with the Korean Powerpack currently?