Major boost for our Navy.
Another 4 I class for the navy, this 4 will replace old Yavuz class. Looks like 16 modern Frigattes. Hisar Class OPV. total 26 ships 2030+. Hisar Class is a modulair ship what always can be armed more when it needs. Overal not bad, we will have 8 AESA radar ships. The first test block for the MILDEN subs are going the start and they will get VLS, what this test block is i don't now.
In the Defense Industry Executive Committee; Decisions were taken for the construction of Offshore Patrol Vessels, New Type Landing Ships, New Generation Mine Hunting Ship and National Assault Boat.
What important is, for the agean sea we need FAC, Assualt boats what translator means. Ther wher several project going on for that so what it was we will see soon.
Design phase for AC will start. I hope 50000ton+...
Sounds quite interesting in particular AC, would you please highlight the numbers of each new type which will be built.
Major boost for our Navy.
Another 4 I class for the navy, this 4 will replace old Yavuz class. Looks like 16 modern Frigattes. Hisar Class OPV. total 26 ships 2030+. Hisar Class is a modulair ship what always can be armed more when it needs. Overal not bad, we will have 8 AESA radar ships. The first test block for the MILDEN subs are going the start and they will get VLS, what this test block is i don't now.
In the Defense Industry Executive Committee; Decisions were taken for the construction of Offshore Patrol Vessels, New Type Landing Ships, New Generation Mine Hunting Ship and National Assault Boat.
What important is, for the agean sea we need FAC, Assualt boats what translator means. Ther wher several project going on for that so what it was we will see soon.
Design phase for AC will start. I hope 50000ton+...
I think TF-2000 might be delayed. what do you think?
Normal, what if they build it now and deliver it in 2026? I mean is the radar ready? Siper block 2 and Gezgin cruisemissile ready?
Milgen 9,10,11,12 were supposed to be TF-2000 in the original plan, now they are saying they will be Istanbul Class Frigates instead, idk unless somehow capacity is increasing and they build simultaneously, it might be a delay. Perhaps the planners feel they need to put out ships as soon as possible and obviously Istanbul class is fully developed and will be faster to built, with no growing pains.
Why a second aircraft carrier, though?
What is the status of TF 2000 Destroyer. Why is that program getting so much delayed?