onlinpunit
Trusted Member
And in the end we get neither !Our engine deals are not like yours. We get stuvk because we want tech, not just engine
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
And in the end we get neither !Our engine deals are not like yours. We get stuvk because we want tech, not just engine
No dyde, deal sizes are getting bigger and bigger and bigger. Better to fight it out. Rafale, for instace, will end up 250 jets of all types. We better start squeezing them hard to build capability.And in the end we get neither !
Talks for GE’s engine for India's 5th-gen fighter project AMCA hit roadblock as US giant ‘raises cost by 3 times’
Surendra Singh / TNN / Jun 27, 2026, 11:39 IST
NEW DELHI: India’s negotiations with US’s General Electric (GE) over the F414 fighter jet engine have hit a roadblock after the cost of the proposed US engine for India’s Advanced Medium Combat Aircraft (AMCA) rose sharply, raising concerns about timelines for the country’s most-ambitious fifth-generation fighter programme.
“The F414 engine was initially estimated to cost around Rs 70-80 crore per unit, but GE has now quoted prices almost three times higher,” a DRDO source told TOI.
Aeronautical Development Agency (ADA), nodal agency for AMCA project, requires 15 F414 engines for five flying prototypes. As ADA has frozen the airframe design of AMCA around the engine, GE knows that India’s engine options for its new stealth aircraft are limited.
![]()
As India’s own Kaveri engine project is no more meant for the stealth fighter jet and is only confined to unmanned aerial vehicle ‘Ghatak’, govt, which has kept Rs 15,000 crore initial budget for the project, is likely to face cost escalation if it is compelled to buy the F414 engine at a higher cost.
The same F414 engine has also been planned to power the indigenous HAL-produced Tejas Mk-2.4-5-generation fighter jet later.
Under the Request for Proposal (RFP) issued last month, the final selected industry partner out of the three shortlisted companies — Tata Advanced Systems, an L&T-BEL-Dynamatic consortium, and a Bharat Forge-BEML consortium — is expected to achieve the aircraft’s maiden flight within 30 months of contract signing.
The AMCA project aims to achieve air superiority through supercruise capabilities and AI-assisted avionics. The advanced fighter will feature advanced radar-absorbent materials, serpentine air intakes, and internal weapons bays for low observability. Once ready, it will carry 1,500 kg of internal weapons and 5,500 kg externally.
The five prototypes are expected to undertake 1,800 test sorties in seven years to validate the fighter’s flight-control systems, stealth characteristics, sensors, radar, weapons integration and propulsion performance. Changing the F414 engine at this juncture is not an option with AMCA. The first batch of AMCA is expected to be ready around 2034 or 2035.
China is already operating two primary fifth-generation stealth fighter jets, Chengdu J-20 and the Shenyang J-35, and Pakistan is also planning to buy 40 Chinese J-35 stealth aircraft.
![]()
Ge F414 Engine Cost Increase: Talks for GE’s engine for India's 5th-gen fighter project AMCA hit roadblock as US giant ‘raises cost by 3 times’ - The Times of India
News News: NEW DELHI: India’s negotiations with US’s General Electric (GE) over the F414 fighter jet engine have hit a roadblock after the cost of the proposed U.timesofindia.indiatimes.com
We use essential cookies to make this site work, and optional cookies to enhance your experience.