Yommie
Elite Member
Lol that's German, was your aviation companies designed tailless jets in ww2 lol
It's not hard to make a tailless jet. Until recently it has not been popular to make them. Only B-2 was put into production.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Lol that's German, was your aviation companies designed tailless jets in ww2 lol
Lol do you know what times takes to perfect tailless design, B-2 is the product of decades of research LolIt's not hard to make a tailless jet. Until recently it has not been popular to make them. Only B-2 was put into production.
Not within few months but in few years testing will complete, look dude J50/J36 are more complex than J20, they are first Chinese MANNED jets that have no horizontal and vertical tails, needs rigorous airframe testing to perfect tailless design , as well as new meta-materials/avionics/sensors/maneuverability (unrelated to J20 avionics/sensors/meta-materials/maneuverability) are needed to be tested extensively and this testing takes years to complete
Yes, it is difficult. You do not know WTF you are babbling about.It's not hard to make a tailless jet. Until recently it has not been popular to make them. Only B-2 was put into production.
It is amazing to witness China's aviation industry developing three generations of fighter jets in 40 years (j10/j20/j35/j36/jxx), while India spent 40 years tinkering with the first generation Tejas MK1a. Our half life is almost someone else's life.
Tejas took 40 yrs to limp out, AMCA’s a stealth delay, Kaveri can’t power a tricycle while china aims to dominate air power in the Asia Pacific with the developments of j-36 and j-50.It is amazing to witness China's aviation industry developing three generations of fighter jets in 40 years (j10/j20/j35/j36/jxx), while India spent 40 years tinkering with the first generation Tejas MK1a. Our half life is almost someone else's life.
F-47 has zero chance of becoming operational within 2025-2029 timeframe. There's not even a prototype yet! It's all empty talk. Take it with a grain of salt.J-20 can manage to deliver the first batch to the airforce 6 years after first flight.
J-35/50 enjoys quite a bit faster pace of flight test comparing to J-20, we are definitely see some date before 2030.
A side-proof is, knowing the characters of the US's smart-ass president, since recently they announced Trump-47 will become operational between 2025-2029, it is very likely the date has something to do with the planned delivery date of J-36/50 they get to know atm.
We use essential cookies to make this site work, and optional cookies to enhance your experience.