maverick
Senior Member
- Feb 8, 2009
- 5,273
- 6,643
- Country of Origin
- Country of Residence
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
India's only realistic option is SU-57. I don't see F-35 happening from any angle.@Zarvan , First squadron should be here no later than Dec 2026. PAF is planning it really well, as India most likely will also have their Stealth fighters by 2028 (possibly prototyped local if not getting F35)
The US will not sell f-35. Even turkey don't get f-35 unless India decides to be a cannon fodder.su-57 is no longer feasible for as long as Ukraine war continues.India's only realistic option is SU-57. I don't see F-35 happening from any angle.
Lol you know what's the squadron meaning? 16-18 jets, if we assume that J31 project has more prototypes flying in somewhere in China let assume 7-8 prototypes this doesn't make a single squadron, and remember dude J31 is not reached mass production stage, and 5th gen jets are more difficult to mass produce than 4.5th gen jets@Zarvan , First squadron should be here no later than Dec 2026. PAF is planning it really well, as India most likely will also have their Stealth fighters by 2028 (possibly prototyped local if not getting F35)
Lol you know what's the squadron meaning? 16-18 jets, if we assume that J31 project has more prototypes flying in somewhere in China let assume 7-8 prototypes this doesn't make a single squadron, and remember dude J31 is not reached mass production stage, and 5th gen jets are more difficult to mass produce than 4.5th gen jets
And last jigs and tools are not ready for mass production of J31
Its the engine that needs to be mass produce first before the plane. If China wants to build 20-30 j-35/j-31 per year it can easily be done lol just expand production line. Everything in China is all about speed. Chinese production of j-20 already at 100 per year. The question is not really how much China can produce but how much planes does paf want I guess in small batches and they would be costing heck of alot of money one squadron sound reasonable to me. Just delivery time may varied . If plaaf order comes in. There will be an extra production line open.Lol you know what's the squadron meaning? 16-18 jets, if we assume that J31 project has more prototypes flying in somewhere in China let assume 7-8 prototypes this doesn't make a single squadron, and remember dude J31 is not reached mass production stage, and 5th gen jets are more difficult to mass produce than 4.5th gen jets
And last jigs and tools are not ready for mass production of J31
SAC is also busy in lots of other projects not working only on J31 projectIts the engine that needs to be mass produce first before the plane. If China wants to build 20-30 j-35/j-31 per year it can easily be done lol just expand production line. Everything in China is all about speed. Chinese production of j-20 already at 100 per year. The question is not really how much China can produce but how much planes does paf want I guess in small batches and they would be costing heck of alot of money one squadron sound reasonable to me. Just delivery time may varied . If plaaf order comes in. There will be an extra production line open.
Awacs, tankers and bombers are not built by SAC but J16,j11, J15 etc etc and maintenance and lots of top secret projects, and why you bring J20 into discussion? I'm talking about SAC which is developing J31 not CACYes j-16 and engines. Tankers,awacs , and bombers by xian. J-20 by Chengdu.
Did u read my tweet? I said xian industrial cooperation. I just give u example where each one is built from. So there are plenty of room for production of j-31/j-35. There's no lack of capacity.Awacs, tankers and bombers are not built by SAC but J16,j11, J15 etc etc and maintenance and lots of top secret projects, and why you bring J20 into discussion? I'm talking about SAC which is developing J31 not CAC
Why you bring other companies to the topic of discussion?
This thread is related J31 hence its developing company SAC, so stick to the topic of discussion and avoid off topic discussion
Why bring Xian its the topic of J31 and developing company SAC not Xian, stick to the topic of discussion please, thanksDid u read my tweet? I said xian industrial cooperation.
It's in the testing phase bro and we are seeing only one prototype since late 2023, how it's possible to begin the unfinished product for mass production in year or twoAnyway, u think China can't build a squadron of j-31? Can easily get it done in one year if it wants to the more orders the faster things will be out in service. There's no lack of capacity only orders count.
When the orders are in I didn't say now.it doesn't take long to mass produce at all. J-20 numbers jumped like crazy after mass production ws-10 engine. We don't know how far in development for ws-19 yet. I said all that matters is the engine.It's in the testing phase bro and we are seeing only one prototype since late 2023, how it's possible to begin the unfinished product for mass production in year or two
You want PAF to buy unfinished product without any state certification and testing?When the orders are in I didn't say now.