Dude they are building a frigate based on an already existing design not the Star destroyer, when the JCF first started the development they gave a 25-26 timeline for the completion of design work so project is on track for its slated timeline.
Your reply is against my which point specifically ? I never talk specifically about "design work" of the ship. I gave overall idea for the first to be inducted in PN around 2033. If construction to start today, then its 6 to 7 yrs till completion of all steps and final induction which isn't bad. Ship building is time taking process. Recall we built last Azmat FAC in around 5 to 6 yrs. That was a mere 600 ton ship.