YourDaddy
Registered Member
??? I said production can be scaled up I didn't say paf will get j-31 by 2026 lol.u are funny manYou want PAF to buy unfinished product without any state certification and testing
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
??? I said production can be scaled up I didn't say paf will get j-31 by 2026 lol.u are funny manYou want PAF to buy unfinished product without any state certification and testing
When testing phase will be finished, when? Nobody knows when??? I said production can be scaled up I didn't say paf will get j-31 by 2026 lol.u are funny man
Most likely when fujian is fully operational. My guess is 2026 time frame.naval variant will be in service first and foremost.When testing phase will be finished, when? Nobody knows when
J35 is unrelated project to J31 projectMost likely when fujian is fully operational. My guess is 2026 time frame.naval variant will be in service first and foremost.
Idk really at least 1-2 year behind most likely. 2028 time frameJ35 is unrelated project to J31 project
Na 2030-2032 will be the most realistic timeframe for PAF will induct J31Idk really at least 1-2 year behind most likely. 2028 time frame
It's depends on WS19 testing phase, WS19 is intended for J31 but currently J31 is with interim engine called WS-13IPEI didn't say it will be for paf. But yes 2030 sounds about rightu know what engine will be used on j-31?
Yes it will be the medium weight jet like F35 whereas J20 is a heavy weight jet like F-22/F35 comboSo j-31 will be 2 single engines?
Squadron I don't see happening. But first three J-31 may arrive by then. Pakistan will take them to limits and if some changes are required then Pakistan my ask for them.Lol you know what's the squadron meaning? 16-18 jets, if we assume that J31 project has more prototypes flying in somewhere in China let assume 7-8 prototypes this doesn't make a single squadron, and remember dude J31 is not reached mass production stage, and 5th gen jets are more difficult to mass produce than 4.5th gen jets
And last jigs and tools are not ready for mass production of J31
Which three? First prototype that flew in 2012 and had rather raw stealth features and massively underpowered by the RD-93 engines? We had seen it on zuhai airshow to maintain speed and altitude it was continously using afterburnersSquadron I don't see happening. But first three J-31 may arrive by then. Pakistan will take them to limits and if some changes are required then Pakistan my ask for them.
J35 is unrelated project to J31 project
Those boys don't know anything about 5th generation (yet) let alone having enough engineering background to test aircraft experimentally.Here is my latest prediction not based on any news but my own analysis. Pakistan will eventually get J-31, I mean really soon, may be even get prototype 5th and 6th one or the first three from small batch production just like Z-10. Our boys will test it in here in Pakistan, we would take it to limit and put them in real life situations then if want few more changes in them or some additions we would ask for them or if satisfied we may straight would give a bigger order.
We use essential cookies to make this site work, and optional cookies to enhance your experience.