First block being constructed for TF-2000 class Destroyer
ASFAT General Manager Mustafa İlbaş announced that the second phase work of the TF-2000 Air Defense Warfare Destroyer Project is proceeding as planned and that the first block is being constructed
Mr. ILBAS stated that the TF-2000 is now beginning to visibly enter the production phase, while expressing that the completion of Phase-1 work in the MİLDEN AIP Submarine Project is expected toward the end of the year
Along with American Destroyers, TF-2000 will be NATO's most heavily armed Destroyer.
Without quad-pack capability ... ( total of 116 Missiles )
96 cells VLS ..... ( mix of 80 HISAR-D RF and SIPER-2 SAMs )
48 HISAR-D RF SAMs
32 SIPER-2 SAMs
20 x GOKSUR-100N point defense missiles
1 x GOKDENIZ 35 mm CIWS
1 x NAZAR LASER electronic warfare System
16 x ATMACA anti-ship Missiles
6 x ORKA Torpedos
1 x MKE 127 mm naval Gun
With quad-pack capability .. ( total of 164 Missiles ) in the future
96 cells VLS ..... ( mix of 112 HISAR and SIPER SAMs )
64 x HISAR SAMs
48 x SIPER-2/3 SAMs
20 x GOKSUR-100N point defense missiles
1 x GOKDENIZ 35 mm CIWS
1 x NAZAR LASER electronic warfare System
16 x ATMACA anti-ship Missiles
16 x GEZGIN land attack Cruise Missiles
6 x ORKA Torpedos
1 x MKE 127 mm naval Gun
The first TF-2000 Destroyer will be launched in 2028 and delivered in 2030
View attachment 209404
The remaining 3 TF-2000s Destroyers will be produced and delivered simultaneously in 3 different shipyards within 3 years.

Minimum of 4 years per ship if they are constructed in different shipyards and göksur could also be the stand alone version with 12 missiles


Türkiye's first indigenous air defense Destroyer, the TF-2000, is equipped with a state-of-the-art suite of locally developed sensors, weapon systems and electronic warfare suites.
Only a few Countries in the world possess this capability
View attachment 209405
Full of Indigenous Systems
- CAFRAD 4D AESA Search Radar
- UMR S-Band Long-Range Radar
- CFR X-Band Multi-Function Radar
- AYR X-Band Illumination Radar
- ALPER LPI Radar
- 360-Degree Direction Finding (DF)
- Digital Radio Frequency Memory (DRFM)
- ADVENT Combat Management System
- FERSAH hull mounted Sonar
- DUFAS low frequency towed Active Sonar
- IFF System
- PIRI Infrared Search and Track (IRST )
- Electro-Optical Daylight (EOD)
- MIKONS (National Console) and Multifunctional Displays (MFD)
- HIZIR Torpedo Countermeasure System ( soft kill )
- TORK Torpedo Countermeasure System ( hard kill )
- ARES Electronic Support / Countermeasure Suite
- KALKAN Decoy Launching System
- LIS Laser warning receiver
- Acoustic torpedo tubes
- MİLYOS (National Maritime SATCOM)
- Software Defined Radios (SDR)
- X-band Satellite Communication System
- KU band Satellite Communication System
- KA band Satellite Communication System
- V/UHF Line-of-Sight (LOS) Systems
- Unmanned Systems Command & Control (C2)
- Integrated Ship Communications System (ISCS)
- Wireless Tactical Intercoms
- T-Link tactical data Link
- MIDLAS VLS
- MKE 127 mm naval Gun
- STOP 25 mm stabilize Gun
- GOKDENIZ 35 mm CIWS
- NAZAR Laser Electronic Warfare System
- HISAR-D RF SAM
- SIPER-2 SAM
- GOKSUR-100N point defense Missile
- ATMACA anti-ship Missile
- GEZGIN Land attack cruise Missile
- ORKA Torpedo
----------------------------------------------------------------------
Each Destroyer would create an air defense bubble with a diameter of 200 km , and 4 Destroyers would cover critical areas of the Eastern Mediterranean (around Cyprus, energy fields).
This would create a de facto "no-fly zone" effect: Approaching Aircraft would be threatened from long range, and even stand-off weapons would be stopped by layered defense
The TF-2000 will be a very powerful air defense Destroyer However, For this, an integrated operation of E-7T AEWC, a long-range S, L , VHF/UHF radar network on Land and platforms like ISTIF class Frigates at sea
delivery time of the three i class was also 36 months but it took longer still acceptable but still and TF 2000 is not only much larger but way more complex thats why a 36 months delivery timeline seem unrealistic
contract was signed in January/February 2023 and delivery time was 36 months so...![]()
Demir: Turkiye Will Build Three MİLGEM Frigates in 36 Months | TURDEF
President of SSB Demir stated that the 6th, 7th and 8th ships of the MİLGEM project, the I Class Frigate, will be realised at private shipyards.turdef.com
1 week ago , Turkiye's 6th ISTIF class frigate ( F-520 ) TCG KARADENIZ was launched .. ( July 27, 2026 )
Turkiye responded to Greece's deployment of 4 BELHARRA Frigates with 8 ISTIF Frigates.
View attachment 209427
The I-class have 16 vls while TF-2000 have 96. Does turkey have any plans to have something in the middle as well ? Like say 48 VLS cells ship . ?