Chinese 6th Generation Aircraft News & Discussions

@NGAD IS THE BEST

No more pitot tube. Production is getting close.

To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Not at all, J-36 is to go long way before production, my best guesstimate for starting a production for J-36 will be 2033-2035
 
Not at all, J-36 is to go long way before production, my best guesstimate for starting a production for J-36 will be 2033-2035

China can fast track and induction J36 and then slowly upgrade them like they done with J10A J10B J10C where it reached world class level. But China has no need to do this, by 2033 2035 J36 will be cutting edge, with next generation engine, avionics, missiles etc. J20 and J35s are more than enough till 2035s.
 
Not at all, J-36 is to go long way before production, my best guesstimate for starting a production for J-36 will be 2033-2035

Not that long. It's going way faster than J-20 where first flight and production spanned 6 years. J-36 production 2028 at the latest.
 
Not that long. It's going way faster than J-20 where first flight and production spanned 6 years. J-36 production 2028 at the latest.
j36 first known flight was dec 2024 , and you think they will go into production by 2028 :rofl: :rofl: ,
 
j36 first known flight was dec 2024 , and you think they will go into production by 2028 :rofl: :rofl: ,

J-20 first flight 2011, production 2017. 6 years. J-36 is going twice the speed. First flight 2024, production 2028. 4 years.
 
Not that long. It's going way faster than J-20 where first flight and production spanned 6 years. J-36 production 2028 at the latest.
J-20 had 8 prototypes for its development and J-36 has only 2 protypes so far and will have totally different aerodynamics/ avionics/radars from J-20, Its take time at least 5-9 years for maturing its aerodynamics/avionics/radars
 
J-20 had 8 prototypes for its development and J-36 has only 2 protypes so far and will have totally different aerodynamics/ avionics/radars from J-20, Its take time at least 5-9 years for maturing its aerodynamics/avionics/radars

We shall see.
 
J-35 is not a priority. It's only used by Chinese navy.
Navy had to be prioritize especially when 4th and 5th aircraft.carrier is going to be completed soon. They will need J35 in around 100 of them to be placed on all the five carriers
 
Navy had to be prioritize especially when 4th and 5th aircraft.carrier is going to be completed soon. They will need J35 in around 100 of them to be placed on all the five carriers

China developed the J20 and all concentration were on that plane, now China is building aircraft carriers and 2 versions of J35 is in production, one for airforce which will be exported aswell and another one for navy which will be used on the aircraft carriers. By the time aircraft are ready, J35s will also be inducted. 2030 is the timeline since its all next generation systems, will need many years to fully operationalise them and develop tactics. Back to 6th generation topic.
 

Users who are viewing this thread

Pakistan Defence Latest

Latest Posts

Back
Top