Yasser76
Elite Member
Bro by end of 2028, "expected to start" replacing radars on 230 fighter jets. And the article on this reads,
"""
In February 2025, DRDO, which displayed a model of the radar with a 950-mm antenna and about 2,400 GaN T/R modules, claimed that development of the Virupaksha radar was progressing as planned. DRDO subsequently told Janes that it had finalized the radar’s design architecture.
Developmental trials using a Hawker-800 are reportedly planned for 2027, with Su-30MKI integration planned for 2028""""". This radar is already
![]()
India's Su-30MKI Upgrade Built on Shaky Ground: Can HAL Rely on "Unproven" Virupaksha AESA Radar?
HAL’s Su-30MKI upgrade pivots almost entirely around the Virupaksha AESA radar being developed by DRDO to replace the existing N011M Bars Passive Electronically Scanned Array (PESA) radar. DRDO’s confidence in successfully developing the Virupaksha AESA on a tight timeline rests on its...www.eurasiantimes.com
I asked Google AI for status on this radar.
View attachment 213675
By the way I beloeve you are mixing Tejas moderinization program with SU-30MKI upgradation program.
Nope, the AESA Is no where near ready. Same people who promised 4 Sqds ofd MK1A in service now are claiming a world class, Indian made AESA radar will be ready in less then 2 years from now. Dude, are you for real?


