PAF J-35AE - News, Updates and Discussions

Bro by end of 2028, "expected to start" replacing radars on 230 fighter jets. And the article on this reads,

"""
In February 2025, DRDO, which displayed a model of the radar with a 950-mm antenna and about 2,400 GaN T/R modules, claimed that development of the Virupaksha radar was progressing as planned. DRDO subsequently told Janes that it had finalized the radar’s design architecture.

Developmental trials using a Hawker-800 are reportedly planned for 2027, with Su-30MKI integration planned for 2028""""". This radar is already


I asked Google AI for status on this radar.

View attachment 213675


By the way I beloeve you are mixing Tejas moderinization program with SU-30MKI upgradation program.

Nope, the AESA Is no where near ready. Same people who promised 4 Sqds ofd MK1A in service now are claiming a world class, Indian made AESA radar will be ready in less then 2 years from now. Dude, are you for real?
 
Btw @Deino @Michael - On the subject of contracts and delivery - always good to read between the lines.

A recent interview by a PAF veteran mentioned the J-35 is coming but added a note on "Credit problems" - but cited public knowledge as his source.

On that I am extending that getting credit is one of the primary issues - it's not exactly a cheap purchase(not knowing the exact unit cost) but that also could tie into why PAF has also not signed on for additional J-10CEs because simply Chinese Banks are a little jittery considering all the other loans(even if on time payments exist).

So while all other technical, training and so on considerations are speculation - lack of finances/credit is the strongest factor backed by actual known facts on the economic conditions.

There was also talk of PL-17 and so on - here I am thinking he relied too much on public sources.
Why would Pakistan join MDA if credit can't be arranged , what good is PAF for middle east without J 35 ?
 
Dude, are you for real?
The referred article also claims…

Realistic Upgrade Timeline

Even ignoring imponderable delays inherent in technology development, in 2028, when integration of Virupaksha with the Su-30MKI commences, Virupaksha would be at roughly the same development stage as Uttam was in 2019.

Under the circumstances, a realistic goal for the start of serial upgrades of the Su-30MKI would be 2035.
Indian analysts aren’t jumping the gun this time around.
We on the other hand still believe J-35A to be inducted between 2026-27 :rolleyes:
 
I can feel my flesh and bones. I believe I am.

Yeah, shame more Indian fantasies are not. Tejas does not even have a radar made by India yet despite decades of work, and now you want us to think they will have a world class SU-30 sized AESA ready and fitted in with no problems in less then a year!?

WTAF!?
 
Aircraft arent the immediate focus - AD and loitering systems along with BMs are to get the upper hand or "parity" at a minimum.

Even with additional Rafale's India will still struggle getting a longer stick so it too is focusing on networked ops - with much less enthusiasm for new jets.
Exactly, we don't have deep pockets like Arabs that we can go on a buying spree. Members here want more J10's along with J-35, HQ-19, hypersonic missiles, drones, nuclear subs and what not all at once.
 

Users who are viewing this thread

Latest Posts

Back
Top