I think it's too early for the Turkish navy to have an aircraft carrier. We don't have the aircraft to put on an aircraft carrier. We only have TB3 and Kizilelma. There is no way Kaan can land on an aircraft carrier. There are no Tf-2000 air destroyers to protect the carrier.
Turkish Navy will get this Aircraft Carrier in 2035-2040 period
not in 2020s
So until 2035 , We will have everything to protect Aircraft Carrier including 4TF-2000 class Destroyers , 8 ISTIF class Frigates and 6 Type-214TN class AIP Submarines
even many more ...
KIZILELMA-C . ANKA-3 and ANKA-4 stealth Fighter Jets can be used on Aircraft Carrier
for example KIZILELMA-C is not a Drone
It will be 16 m unmanned stealth Fighter Jet with 2x TF-10.000 turbofan Engines
KIZILELMA has same advanced characteristics as 5th-generation Fighters
-- High situational awareness with IRST , EOTS and AESA Radar
-- Stealth design featuring a low radar signature
-- Internal weapon bay for stealth flight capability
-- Smart fleet autonomy equipped with artificial intelligence
-- Air to Air Missiles , Guided Munitions , Cruise Missiles
ANKA-3 will be lethal platform for deep strike capability
as well as ANKA-4 will be developed for air combat role
In 20 years, we may think of an aircraft carrier, but such statements now call into question the seriousness of the Turkish defense industry.
Nobody has better info than Our Presidency of Defense Industry and Generals/Admirals
They very well knows that what they doing
Commander of the Naval Forces
President of Defense Industry
Chairman of BAYKARTECH
The project should be started now that it can be combat ready in 10-15 years
Unmanned aerial platforms will be developed specifically for this project
Btw Turkiye has enough money with over $1 trillion of GDP
and Turkiye increase its defense budget from $16 billion to $38 billion for 2024
in the next 10-15 years Turkiye will have over $2 triillion of GDP
Some users wrote ridiculous things about money
Turkiye has enough money to build 4 ISTIF class Frigates , 2 HISAR class OPVs , 3 REIS class Submarines , 2 Logistic Support Ships at the same time to be in service in 2023-2027 period
also modernization of 4 MEKO-200 Frigates
FAC project is delayed due to design expectations, not due to financial problems.
and We focused on OPV which is more expensive than FAC project