75kg each let say 100 and let say the launching system is 1000kg (its not) well 12 or 16 of it are well within tolerance of ARAS-2 let not talk about IVECO truck that come in two version a 3.5t and a 5.5t
I have seen Aras-1 trucks. And you forget what will happen when the the stabilizers are deployed which will have to be upgraded to handle the extra 1500kg in additional weight.
Now imagine that truck with another 1200-1500kg on the back and the impact that will have the frame and axels when it’s lifted by the stabilizers.
And for what? You are trying to turn Majid (a redundant point defense system) into a Pantsir or heavy SOHRAD. This is called project creep and US military knows this well, when you try to take a system and make it into something else you will be left with a system that does neither very well.
As I said Majid is fine in a 8 launcher set up (4 on each side). It would supplement SHORAD family of Dezful (Iranian Tor), Iranian Pantsir, Dey, Khordad, and Iranian Umkhonto
Btw whAt happened to this system
We never heard of it again