Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Engineering Fail
One of Key responsibility of Engineering Company is to Develop Design that can handle Earth Quake and Stuff like Rain with proper drainage
No friggin way we have standing water on a flyover. In any decent country the contractor would be out of business.

Note: I have posted these views in Flood Update Thread
Pakistan should be diverting extra water towards Thar Desert
عمران خان کی طرح نیت درست ہو تو کچھ بھی ممکن ہے۔
These projects were never completed because , money went to buy BMW and Salary raises for PML and PPP officials
Seems like a basic engineering project
- To develop a redirect channel for water to Thar Desert (Route 1 )
- Secondary redirect at (Route 3) to barren desert like region west of Pir Mahal
Project 1:
150-175 KM worth of Canal , to move water to Thar (R1)
View attachment 144310
- Divert 30%-40% flow to new route
- Canal Channel running near Pakistan-India border can just carry extra load of water towards Sindh Desert Zoe
Project 2:
80-100 km worth of Canal to move water to (R3)
The 30-40% of flood water will help irrigate the desert region as the
space is almost 100km-200km wide and 600km in length
The water can be released in safe way in Desert improving chance to create forest in desert
There is a narrow stretch where we have a Giant Location for Artificial Lake , some water can in theory also be moved to this location with Canal Networks and saved for usage in KPK
View attachment 144311
Water released in Sindh Desert will create forest
Right now it is destroying homes and cities and villages
We use essential cookies to make this site work, and optional cookies to enhance your experience.